THE ASPIRA CONSTRUCTION UPDATE — SEPTEMBER 2025
As of early September, The Aspira structure has reached the 5th floor and is now rising toward the 6th, marking a bold vertical leap within the TOD masterplan — where Metro Stations S12 & S13 will sit just steps from the residence, unlocking an unprecedented rhythm of connected living. With every floor added, a new [...]
07/09/2025